Ensuring high performance yet adhering to short deadlines; stringent cost control, netplanning and good logistics.

View our references or simply contact us in order to find out more.


Being an assembly company engaged in a wide scope of activities, IMR Hamburg d.o.o. has also focussed on various types of assembly...


As a growing assembly company, IMR Hamburg d.o.o. wishes to meet all our clients’ requirements and has therefore has succeeded ...


Due to inflationed need on shipyard trade market and service, we can point out, to stretch our influence on that economical field,especially in construction frames of shipping build...


IMR Hamburg d.o.o. worked on its largest projects related to construction of new and reconstruction of existing industrial plants, mainly cement production plants...


Assembly of power plants includes assembly of boiler plant equipment, as well as overhaul of existing power plant facilities. ...


From the beginning of IMR Hamburg d.o.o., we have been participating in major petrochemical projects, both in Croatia and worldwide...

Featured projects

  • BOA Plus Neurath

    BOA Plus Neurath

    Investor: RWE POWER
    Client: Hitachi Alstom Consortium
    Type: Boiler
    Period: 2013
    Installation of sootblower systems

  • Projekt br. 3

    GKM 9

    Investor: Power plant Mannheim
    Client: ALSTOM
    Type: Boiler
    Period: 2010-2014
    Installation of High Pressure pipelines

  • Projekt br. 4


    Investor: Electrabel
    Client: Hitachi Power Europe
    Type: Steam generator
    Period: 2009-2013
    IP/LP Detail Engineering, Prefabrication and Installation IP, LP and HP Pipelines, Installation of turbine system pipelines, Installation of asch loading system, Installation/Dismantling Installation of instrumentation pipeline, Documentation und pressure test, Commissioning support

News / Information

Prev Next
The IMR Hamburg hall- soccer team competed for the fourth time on extremely high- leveled  hall- soccer tournament of " Summer Cup" in Munich.

The IMR Hamburg hall- soc…

Of 43 registered teams the IMR Hamburg reached semi- finals in front of more than 400 view...

Read more
New contracts had been signed with the company KRONOSPAN

New contracts had been si…

On 27th May,2016.the new contracts had been signed with the company KRONOSPAN CRO d.o.o. f...

Read more
Barisic and Andjelic successfully completed IWE/IWT- seminar

Barisic and Andjelic succ…

To achieve the improvement in the welding duties,the company IMR Hamburg d.o.o.decided to ...

Read more
Croatian businessmen are to penetrate the till now tight frontiers,the croatian economic diplomacy move the issues from dead point

Croatian businessmen are …

In the constitution of economic delegation, which was recently present in Iran, headed by ...

Read more
Performer of the month Antun Bozanovic IMR

Performer of the month An…

Since September 2015. IMR HAMBURG is present in Rijeka oil Refinery and is currently invol...

Read more
Successful completion of works on condensate collection system in Rijeka refinery

Successful completion of …

Successful completion of works on condensate collection system in Rijeka refinery. Client:...

Read more